Difference between revisions of "Peckham Rye Station Gateway"

From Peckham Vision
Jump to: navigation, search
(Deputation 22nd October 2013)
(March 2020 follow up to Public Meeting)
 
(540 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
{{Seealso|
 
{{Seealso|
 
*[[News]]
 
*[[News]]
 +
*[[Planning]]
 +
*[[Transforming Central Rye Lane]]
 
*[[Peckham Town Centre]]
 
*[[Peckham Town Centre]]
 
*[[Peckham Town Centre Forum]]
 
*[[Peckham Town Centre Forum]]
*[[Transforming Central Rye Lane]]
 
 
*[[Rye Lane and Station Action Group (RLSAG)]]
 
*[[Rye Lane and Station Action Group (RLSAG)]]
 
*[http://www.bellenden.net/srug Southwark Rail Users' Group (SRUG)]
 
*[http://www.bellenden.net/srug Southwark Rail Users' Group (SRUG)]
 
*[[Peckham Rye Station]]
 
*[[Peckham Rye Station]]
*[[Old Waiting Room]]
+
*[[Peckham Rye Station stages]]
 
*[[Peckham Rye Station/station forecourt]]
 
*[[Peckham Rye Station/station forecourt]]
 +
*[[Art Deco Quarter]]
 +
*[[Old Waiting Room]]
 
*[[Gateway comments]]
 
*[[Gateway comments]]
 +
*[[Gateway model]]
 +
*[[Gateway plans]]
 
}}
 
}}
  
 +
===Gateway project key documents:===
 +
Some key official documents about this station redevelopment project were released under Freedom of Information in August 2013. [[Peckham_Rye_Station_Gateway/2011-2013#Gateway_project_key_documents|These can be found here]] (at Item 5) along with some commentary papers by Peckham Vision on the issues raised by the project. Details of all the stages in the development of this project are below in date order.
  
 +
'''To be incorporated below'''<br>
 +
- '''[https://www.facebook.com/PeckhamVision/posts/1018492951506901 Planning application for the Station Sq & Blenheim Grove now submitted]'''<br>
 +
- [[Peckham_Rye_Station_Gateway/Jan-Sep_2014#Council-community_partnership_for_station_scheme_25th_February_2014|Council/Network Rail CoDesign statement Feb 2014: promising 'local people full partners in shaping scheme']]<br>
 +
''<small>Peckham Vision is NOT and never has been part of Southwark Council, nor part of any organisation that has a contract with the Council to deliver any project. The 'co-design' consultation projects are run by commercial architects as Council's agents. Peckham Vision has had no role in how the projects are designed or run.</small><br>''
  
===Deputation 22nd October 2013===
+
===July 2016 Council weblinks on this page===
There was a deputation to the Southwark Council Cabinet on 22 October 2013 to seek clarity about the plans of Network Rail, the Council and the GLA on the concept design for the station developments. The deputation was led by Bar Story and Sassoon Gallery, with The Sunday Painter and Peckham Vision. The plans all started years ago with a proposal to recreate the square in front to the station. But documents, produced by the Council and Network Rail over the last year, available through Cabinet papers or FOI requests, indicated what seemed like the clearance and development of the whole of the land and buildings alongside and behind the station. The story up to the developments these last few weeks is recorded below on this web page.  
+
'''''Council planning weblinks have all changed. It will take some time to restore all the links.''''' If the link on this page you want is part of the PNAAP process and is broken you can find the adopted Peckham & Nunhead Area Action Plan (PNAAP) here http://www.southwark.gov.uk/downloads/download/4444/area_action_plans
 +
The Council says you can also access it from the Area Action Plans page by clicking on the relevant link, along with the supporting and background documents here: http://www.southwark.gov.uk/info/200211/area_action_plans which can be accessed from the main planning policy page on the left hand side.<br>
  
For several months Peckham Vision had been seeking information about the design concept for the developments without success. A Freedom of Information request in early August finally produced some of this information in mid October including the Council agreement with the GLA on the £5m grant towards the station square, and the [[Media:Design Brief - invitation to tender.pdf|brief for the architects]] about to be commissioned to prepare the planning application and to design and conduct public and stakeholder consultations. At the same time Cabinet received [http://moderngov.southwark.gov.uk/documents/s41484/Report%20Gateway%20to%20Peckham%20-%20Public%20Square%20and%20Station%20Regeneration.pdf a work progress report and update] on the issues raised by the deputation and Scrutiny hearing last April and May from Cllr Fiona Colley. These documents seemed to indicate a number of discrepancies in what was being said about the scale of the developments, and so Peckham Vision wrote LINK TO EMAIL to Cllr Colley seeking clarification.
+
[[Image:20.02.18 Peckham Community Rail Event (With Logos).jpg|thumb|right|290px|]]
 +
==2020==
  
In parallel some of the businesses on the station site who would be destroyed by the kind of plan in the architects’ brief decided to seek clarification through a deputation to Cabinet on 22 October when they were receiving the report on the development. The deputation’s speech [LINK] to the Cabinet raised five points for clarification and quoted the Council statements in the past that seemed inconsistent with the current plans, including the intentiomn to build on the success of businesses like Bar Story. We were told by the Cabinet that the intention is to develop a planning application for recreating the square and necessary works directly related to it and that there is no intention to do major redevelopment beyond that.  
+
===March 2020 follow up to Public Meeting===
 +
The meeting spaces were booked out and people were turned away at the door. Though this was unfortunate, it showed the rail companies how significant were the issues about the station when so many people turned up in poor winter weather. Network Rail have sent to all who left their email addresses for the meeting [[Media:Peckham Rye Rail Community Event Master Deck v3 (without Architectural slides).pdf|a copy of the several rail companies' slide presentations, see here.]] They have also compiled [[Media:Peckham Rye Station Points Raised v1.4.pdf|a table showing their responses to all the points raised in the meeting.]] They have agreed to hold regular events with the community to get further input from rail and station users as the redesign for improving accessibility develops. Network Rail representatives have agreed to come to [[Media:A4_-_Open_Studio_14_Mar_2020-_v.01_-_clour_bgrnd.jpg|Peckham Vision's Open Studio on Saturday 14th March 2020 12pm-5pm drop-in.]]
  
The planning application is to be submitted next February. The consultation leading to its submission will be able to cover other options than the one called the 'preferred option' that the architects bidding for the contract were asked to use as the basis for their bids. But we have been told that the preferred option plan is just a technical management device for financial appraisal and achieving authority to go ahead, rather than the basis for the real design of what is going to happen.
+
===18th February 2020 Public Meeting===
 +
IMPROVING PECKHAM RYE STATION ACCESSIBILITY - We know that Peckham Rye station is very inaccessible for anyone who has difficulty with stairs or has luggage or prams or small children. The rail industry has plans to change this. They are holding a public meeting on TUESDAY 18th FEBRUARY 7-9pm at All Saints Church, Blenheim Grove. The invitation says the meeting is about:
 +
* How to make Peckham Rye Station accessible
 +
* Agenda: • Update on the current station building. • Updates on train services provided today. • Long term growth and strategy to improve the rail service. • Plenty of opportunities to ask questions and talk to the following rail companies: • Network Rail, Transport for London (for London Overground services), Govia Thameslink Railway (for Southern and Thameslink train services), Southeastern <br>
 +
For more information and to book for a free ticket click here: http://www.tinyurl.com/rfydqn5
  
The architects will be appointed in the next week and start immediately by 4 November. We are looking forward now to a constructive collaboration with them on devising really interesting and effective ways of involving and informing people in Peckham about the ideas, the practical issues and encouraging many people to take part in the discussions and conversations.
+
==2019==
  
===Public conversation about the design of the station developments===
+
===March 2019 work starts===
[[Image:IMG 8302 - Dulwich Fair at Goose Grn.jpg|left|190px|thumb displays]]
+
Work has started on Phase 1 the reconstruction of the building on the corner of Blenheim Grove and Rye Lane to create new commercial units on the ground and first floors, and two new floors for work spaces above. The creation of the space between the viaducts will start when that Phase 1 work has progressed and the plan is to complete it by 2021. '''[https://www.southwark.gov.uk/regeneration/peckham-and-nunhead/peckham-rye-station-square Further details from the Council are here.]''' 
[[Image:IMG 8911 - Choumert Sq Open Garden.jpg|left|190px|thumb displays]]
+
[[Image:IMG 9909 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
[[Image:IMG 0231 - Lot9 Designers' Market 2.jpg|left|190px|thumb displays]]
+
<div style="clear:both;"></div>
+
  
Because the Council did not release any information about the conceptual discussions, Peckham Vision has encouraged a public conversation about these aspects:<br>
+
==January-March 2017==
  
* '''Front of station:''' A new square is being created in front of the station. What kind of square? What would you like to see there..?
+
===13th February 2017 Community discussion===
* '''Back of station:''' The plan is to create a new area at the back, linked to the new front square. What would you like to see there..?
+
Peckham Vision arranged a discussion of '''[[Media:Kaizen_report_-_Learning_the_lessons_on_co-design_in_Southwark.pdf|the Kaizen review report]] '''to enable people who had been involved in the co-design process for the Station or Library Squares to see if there was anything to add to the report and to discuss the follow-up actions. Jonny Zander from Kaizen Consultants, the author of the report, was present and took part in the discussion. [[Media:17.02.13_PV_Codesign_v2.pdf|The notes from the meeting are here.]]
* '''Blenheim Grove:''' What would you like to see happen in the arches with fronts on Blenheim Grove..?
+
  
These different areas of the station development site are explained [[Peckham_Rye_Station_Gateway#Revised_map_of_properties_in_the_station_plans_June_2013|below with a map]]
+
===12th January 2017 Council drop-in update===
 +
The Council will hold a drop-in event at former Barry's Café 3 Station Way for the latest news on:
 +
* Programme for construction of the new square and the redevelopment of the Blenheim Gove/Rye lane corner building.
 +
* Relocation of the businesses.
 +
* Progress with the Compulsory Purchase Order (CPO)
 +
* Update on the [[Peckham_Rye_Station_Gateway#Review_of_Co-design_process|Co-Design Review]]
 +
More Council information: [http://bit.ly/2hOswWS about the event,] and [http://www.2.southwark.gov.uk/info/200557/peckham_and_nunhead_projects/4028/peckham_rye_station_square about the development]
 +
The review report was available at the drop-in and '''[http://www.2.southwark.gov.uk/downloads/download/4763/learning_the_lessons_on_co-design_in_southwark is now on-line.]''' Information is awaited from the Council about the follow up.
  
Please post your comments on [https://www.facebook.com/PeckhamRyeStation Facebook page Peckham Rye Station] or email [mailto:info@peckhamvision.org info@peckhamvision.org]
+
==October-December 2016==
+
===Review of Co-design process===
Comments are posted up [[Gateway_comments|here.]]
+
Consultants Kaizen conducted a review of the two co-design exercises. Their report will be published on 10th January 2017. The consultants will be available to discuss the report at the Council consultation [[Peckham_Rye_Station_Gateway#12th_January_2017_Council_drop-in_update|drop-in on 12th January 4-8pm at 3 Station Way.]] Some submissions to the consultants' review commenting on the co-design projects are available here: '''[[Media:CODESIGN_ECONN_COMMENTS_%2B_contents_list_final.pdf|Eileen Conn]],''' '''[[Media:Clyde_W_Co-design_observations_24.10.16.pdf|Clyde Watson.]]''' Some main comments are that much more work needs to be done to agree what co-design should mean in practise and how it should be conducted. Co-design is part of a set of mechanisms to bring about collaboration between different stakeholders. Successful collaboration cannot be imposed and so agreement on the remit and parameters of a co-design process seem essential. Also for successful codesign with communities a parallel process for communities to share and discuss the ideas and the work seems an important ingredient. None of this was present in the Peckham projects and their absence had a negative effect on the experience and the outcome. The review was conducted after local deputations to the Cabinet, Community Council and Planning Committee. To learn the lessons adequately, it will be essential for the community to be effectively engaged in discussing and reviewing the consultant’s report into the process - as part of the Council's development of its response. Otherwise the key lesson about collaboration will still not have been learnt.
  
===7th September 2013 - Peckham Rye Fete===
+
===Co-design process 2013-2016===
Peckham Vision's mobile exhibition returned for another year to this popular summer fete, where more discussions about the town centre and station developments were had.
+
====Introduction====
[[Image:IMG_0031 - Peckham Rye Fete 2013.jpg|left|190px|thumb displays]]
+
Following the [[Peckham_Rye_Station_Gateway/Jan-Sep_2014#Network_Rail_plans_reveal_total_demolition_18th_January_2014|rejection by the community in January 2014 of the Network Rail / Council plans for the Station Gateway site redevelopment,]] the Council adopted the [[Peckham_Rye_Station_Gateway/Jan-Sep_2014#Deputation_to_Community_Council_12th_February_2014|suggestion made by the residents' deputation that there should be a rethink using a 'co-design' process.]] This new process was put to tender and the first phase began in June 2014. In December 2014 alongside the Station co-design process, the Council started a 'co-design' consultation on development ideas for the Peckham Library Square including the Peckham Arch and 91-93 Peckham High Street. The section below outlines the phases of the co-design process for both the Station and the Library Square projects. The experience of those who took part in various roles is now (October 2016) being reviewed by Council consultants. <br>
[[Image:IMG_0036 - Peckham Rye Fete 2013.jpg|left|190px|thumb displays]]
+
'''Complete their survey here:''' '''https://www.surveymonkey.com/r/SouthwarkCoDesignReview''' The survey is now closed.
[[Image:IMG_0038 - Peckham Rye Fete 2013.jpg|left|190px|thumb displays]]
+
 
[[Image:IMG_0044 - Peckham Rye Fete 2013.jpg|left|190px|thumb displays]]
+
===Summary of process stages===
<div style="clear:both;"></div>
+
====PECKHAM RYE STATION DEVELOPMENT====
[[Image:IMG_0048 - Peckham Rye Fete 2013.jpg|left|190px|thumb displays]]
+
'''Background''' The lead up to the Co-Design process started in 2013 when there were indications that the Council was planning to seek possession of all Network Rail’s land around the station at once so clearing out all the businesses. This led to two deputations to the Council [[Peckham_Rye_Station_Gateway/2011-2013#PV_Deputation_to_Cabinet_to_stop_wholesale_clearance_of_businesses_on_station_site_16_April_2013|April 2013]] and [[Peckham_Rye_Station_Gateway/2011-2013#Deputation_22nd_October_2013|October 2013]] and a [[Peckham_Rye_Station_Gateway/2011-2013#Revised_Council_position_on_station_plans_June_2013_.26_Scrutiny_meeting_20_May_2013|Scrutiny Committee May 2013]] seeking clarity about this. The Council said that was not the plan. But when the plans were [[Peckham_Rye_Station_Gateway/Jan-Sep_2014#Network_Rail_plans_reveal_total_demolition_18th_January_2014|unveiled at a public meeting in January 2014 it turned out that was the plan.]] The community rejection of the plan at that public meeting in Rye Lane Chapel led the Council to agreeing to hire new consultants to redesign the plan for the whole Gateway site involving the community, [[Peckham_Rye_Station_Gateway/Jan-Sep_2014#Council-community_partnership_for_station_scheme_25th_February_2014|through a ‘Co-design’ process.]] Ash Sakula architects were appointed in June 2014. Because of this long community background which was led by Peckham Vision, this website has a detailed record of the process until September 2014, when the co-design process started. Thereafter, it is less detailed, and needs to be read in conjunction with the co-design web links. There were inadequacies in the whole process of 'co-design' which meant that a number of important matters were not adequately discussed during the process. This led to [[Peckham_Rye_Station_Gateway#January-March_2016|many objections to the detailed planning application]] which were unresolved when the plans were approved in March 2016.
[[Image:IMG_0061 - Peckham Rye Fete 2013.jpg|left|190px|thumb displays]]
+
The list of events and happenings that were recorded at the time on this webpage can be viewed at the beginning of the following pages. Click on an item in any of the lists to view the entry for that item.
[[Image:IMG_0063 - Peckham Rye Fete 2013.jpg|left|190px|thumb displays]]
+
* [[Peckham_Rye_Station_Gateway/2011-2013|April to November 2013]]
[[Image:IMG_0067 - Peckham Rye Fete 2013.jpg|left|190px|thumb displays]]
+
* [[Peckham_Rye_Station_Gateway/Jan-Sep_2014|January to September 2014]]
<div style="clear:both;"></div>
+
* [[Peckham_Rye_Station_Gateway|October 2014 to October 2016]] - http://www.peckhamvision.org/wiki/Peckham_Rye_Station_Gateway<br><br>
 +
 
 +
'''Co-design first phase - Ash Sakula, June to October 2014:''' <br>
 +
'''''Peckham Rye Station Co-design Digital Communications:'''''
 +
* Website: http://peckhamcodesign.org/stn-sq-ph-1 This website was modified after the first phase so is not exactly as it was during the first phase of the Codesign exercise.
 +
* Twitter: https://twitter.com/peckhamcodesign
 +
* Facebook: https://www.facebook.com/profile.php?id=100006848925429&fref=nf
 +
'''''Timeline:<br>'''''
 +
[July 2014 Peckham Vision launched the [[Peckham_Rye_Station_Gateway/Jan-Sep_2014#Successful_community_public_event_23_July_2014|community built model of the station area]] at a public community meeting in Bussey Building.]<br>
 +
July 2014:  Ash Sakula arranged event in Peckham Liberal Club for (about 30) residents to meet them.<br>
 +
August 2014: Ash Sakula launch the co-design project on roof of multi storey car park.<br>
 +
September–October 2014: Ash Sakula co-design process in operation including:
 +
* Events during the week in the station forecourt and at foot of the old staircase, and ‘Weekly’ meetings on Tuesday evenings for creating a weekly publication.
 +
* Some meetings in All Saints church hall on different topics.
 +
* A digital ‘Commonplace’ map inviting people to offer comments on places around the station and elsewhere in the town centre: http://peckhamcodesign.org/stn-sq-ph-1/commonplace
 +
* An email list of ‘CoDesigners’ for info about events and other co-design matters.
 +
* ‘Atlas of Aspirations’, a report bringing together different aspects from the CoDesign process.
 +
 
 +
'''Interim stage between the first and second phases, November 2014 to February 2015:'''
 +
* Council issues tender for work to draw up plans and planning application for new station square & Blenheim Grove corner building.
 +
* No information about the remainder of the other land and buildings around station, including Holly Grove, Dovedale Court and access to station platforms.
 +
* Four residents take part in architects selection process.
 +
* Interviews of shortlisted architects in January 2015.
 +
* Landolt & Brown architects appointed.
 +
* [[Peckham_Rye_Station_Gateway#20th_February_Co-Design_shrinks_to_small_consultation|co-design shrinks to small consultation]] Letter to South London Press 20 February 2015.
 +
 
 +
'''Co-design second phase – Landolt & Brown, February 2015 to March 2016'''<br>
 +
'''''Peckham Rye Station Co-design Digital Communications:'''''
 +
There is no trace now of the website that was used in the second phase. The Facebook and Twitter pages set up in the first phase were continued in this phase.
 +
* Twitter: https://twitter.com/peckhamcodesign
 +
* Facebook: https://www.facebook.com/profile.php?id=100006848925429&fref=nf
 +
'''''Timeline:<br>'''''
 +
* 4 evening workshops with presentations of info about the issues and designs of the new station square and the building on the corner of Blenheim Grove and Rye Lane.
 +
* First workshop March 2015, final workshop in July 2015
 +
* [[Peckham_Rye_Station_Gateway#September_2015_.27Co-Design.27_disappointing|Co-design disappointing]]
 +
* [http://www.peckhamvision.org/wiki/images/7/71/SNews_letter_CHQ029_13082015_ISSUE1233.pdf letter to Southwark News]- "No 'co-design' for Peckham Rye station". 13 August 2015.
 +
* October 2015 planning application submitted
 +
* November meeting called by local resident to discuss concerns about designs.
 +
* March 2016 Planning Committee grant permission.
 +
___________________________________________________________________
 +
 
 +
====PECKHAM LIBRARY SQUARE====
 +
 
 +
'''Background:''' After the Station co-design process had started the Council decided to use a co-design approach for the development of the Peckham Library Square and 91-93 Peckham High Street, which is all Council property. Peckham Vision's reporting of the Library Square co-design process is covered on [https://www.facebook.com/PeckhamVision Peckham Vision Facebook]<br>
 +
 
 +
'''''Peckham Library Square co-design communications: <br>'''''
 +
* Website: http://www.peckhamsquare.co.uk <br>
 +
* Twitter: https://twitter.com/peckham_square <br>
 +
* Facebook: https://www.facebook.com/pages/Peckham-Square-Co-Design/349308741923851 <br>
 +
 
 +
'''''Timeline'''''
 +
* December 2014 First evening event by Carl Turner Architects in Peckham Platform.
 +
* From January to November 2015 further six evening events where Carl Turner reported on design issues.
 +
* Proposal to remove the Peckham Arch emerges in first half of 2015.
 +
* Mountview development, also by Carl Turner, emerges during 2015.
 +
* Mountview planning application submitted and approved in September 2016.
 +
* Library Square planning application submitted August 2016, not yet decided.
 +
 
 +
===11th October 2016 Co-design review===
 +
Council consultants start review of Peckham co-design process by web based survey. Deadline is 25th October. The Council's information message is: ''"Last year Southwark Council trialled a Co-Design approach to two development schemes in the town centre, Peckham Rye Station Square, and Peckham Library Square. The council is now keen to understand what you thought of the Co-Design process. The council have asked award winning social business [http://www.wearekaizen.co.uk Kaizen Partnership] to carry out an independent review. We have commissioned this work to enable us to better understand how effective Co-Design was and what could have improved it. To gather as much information as possible, an online survey has been created. We would be very grateful if you were able to share your views and experience of the process through this short survey: https://www.surveymonkey.com/r/SouthwarkCoDesignReview  Once the questionnaire responses have been evaluated, the Co-Design review will be shared not only across the council but will be publicly available and will be used to shape future projects in the borough, so we would be very grateful if you’re able to spare a few minute to contribute to this important piece of work."
 +
''
 +
 
 +
==April-September 2016==
 +
===Preparatory work for buildings works===
 +
The Council is continuing with the preparatory work of negotiating the sale of leases and the preparation for compulsory purchase where sale not agreed. Public Inquiry is to be held in early 2017 for several objections. [http://www.2.southwark.gov.uk/info/200557/peckham_and_nunhead_projects/4029/cpos See here for details.]
 +
 
 +
==January-March 2016==
 +
===1st March 2016 Planning permission===
 +
[[Image:Safe_image-6.jpg|thumb|right|290px|Blenheim Grove corner]]
 +
[[Image:7ff37452-38ed-46cf-bd65-3727da71d776-1.jpg|thumb|right|390px|new station square]]
 +
On 1st March 2016 the Planning Committee gave permission to the plans to create the new square at Peckham Rye station and extend upwards two floors on the corner of Blenheim Grove on the basis of the proposals in the planning application. This was in spite of significant objections from a large number of objectors to the details proposed. This was evidence of a failure in the 'co-design' process, which local people say must be subject to an independent evaluation. Here are '''[[Media:PRye station sq planning app Eileen Conn comments.pdf|some comments]]''' on the planning proposals indicating the nature of the objections.
 +
 
 +
[http://moderngov.southwark.gov.uk/documents/s60045/Report%2074-82%20RYE%20LANE%20IN%20FRONT%20OF%20PECKHAM%20RYE%20STATION%20AND%202-10%20BLENHEIM%20GROVE%20LONDON%20SE15%204RY.pdf The planning report is available here.]
 +
[Http://moderngov.southwark.gov.uk/ieListDocuments.aspx?MId=5198&x=1& The Committee agenda and meeting details are here.]
 +
 
 +
Watching the very poor implementation of the 'co-design' for the station developments was so exhausting and disappointing it interfered with our ability to keep the website updated on it. Some of the actions were posted on [https://www.facebook.com/PeckhamVision Peckham Vision Facebook.]
 +
 
 +
==October-December 2015==
 +
 
 +
===12th November 2015===
 +
[https://thespaces.com/2015/11/02/south-london-locals-question-landolt-browns-peckham-rye-station-revamp/  South London locals question Landolt + Brown’s Peckham Rye station revamp]
 +
 
 +
===29th October 2015 Planning application submitted===
 +
The planning application from Landolt & Brown for the new square and changes in Blenheim Grove is now in. This is just for the area in front of the station and the building on the corner of Blenheim Grove & Rye Lane. From the planning website:
 +
Case number: 15/AP/4337:  Provision of a new public square between Peckham Rye Station and Rye Lane, created by demolishing the arcade buildings currently located between the north and south railway viaducts. Refurbishment of the railway arches to provide commercial units facing onto the new square. Refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, hard landscaping and other associated works. 
 +
[http://planbuild.southwark.gov.uk:8190/online-applications/applicationDetails.do?activeTab=dates&keyVal=_STHWR_DCAPR_9563201 Further information] and [http://planbuild.southwark.gov.uk/documents/?casereference=15/AP/4337&system=DC documents.] [http://peckhampeculiar.tumblr.com/post/132149748699/peckham-rye-station-plans-submitted Information from Peckham Peculiar.]
 +
 
 +
==July-September 2015==
 +
[[Image:A1_PV_Panel_05_-_Gateway_-_map_v.13_-_flat_1024.jpg|thumb|right|300px]]
 +
===September 2015 'Co-Design' disappointing===
 +
The Co-Design process has been very disappointing. Following the '''[[Peckham_Rye_Station_Gateway/Jan-Sep_2014#Network_Rail_plans_reveal_total_demolition_18th_January_2014|wholly unacceptable plans from Network Rail]]''' in January 2014, local people suggested a co-design process to enable public discussions about the different parts of the whole site, and how they relate to the town centre. Unfortunately, it became instead just a consultation about design details of a small part of the site (pink on the map alongside - click to enlarge), and without addressing major issues which emerged in 2013 and 2014. Plans are being developed separately and without public discussion for the three other major areas of the site (blue, white and green). A planning application is expected in the autumn for the pink area, and possibly the other areas. There has been no monitoring and evaluation, and so no joint Council & community learning about the co-design process, its effectiveness or how it could be improved. '''[http://www.peckhamvision.org/wiki/images/7/71/SNews_letter_CHQ029_13082015_ISSUE1233.pdf See letter to Southwark News about this]''' in August 2015, titled "No ‘codesign’ for Peckham Rye station".
 +
 
 +
===29th July 2015 4th 'codesign' station workshop===
 +
This last event from Landolt & Brown the Council’s consultant architects was on the design of the new station square and at the building on the corner of Blenheim Grove and Rye Lane on Wednesday 29 July 6.30pm-8.30pm at the Thomas Carlton Centre, Alpha Street, SE15 4NX. (note the change of address.) For more see: http://us9.campaign-archive2.com/?u=25fd80cafe3952ad0b146376c&id=146e79bdc2&e=83ef0156b7 The presentation is here: http://www.peckhamryestationsquare.co.uk/section/presentations/
 +
 
 +
==April-June 2015==
 +
===24th-27th June 2015===
 +
 
 +
Peckham Vision [https://www.facebook.com/events/1589541771334274 held an exhibition]
 +
[https://www.facebook.com/events/368833929980297 and here] in Peckham Vision Bussey studio jointly with MArch students from Brighton University. A new display panel was included which gave an updated report on the Station Gateway project.
 +
 
 +
===4th June 2015 3rd 'codesign' station workshop===
 +
The next PR Station Square workshop will be on 4 June at All Saints Church, more details here: http://tinyurl.com/lns6yyu
 +
Here is a report on the workshop from the architect consultants Landolt & Brown: http://www.peckhamryestationsquare.co.uk/presentations/summary-peckham-rye-station-square-codesign-workshop-03 The consultants said there would be a further workshop in July to report on the proposals for the square, and that they are aiming for a planning application to be put forward over the summer.
  
===Station restoration latest August 2013===
+
===16th April 2nd 'codesign' station workshop===
The Council is developing plans for the design and development of the new front square and new commercial spaces at the back of the station. There is not yet satisfactory information about how the public can contribute to these ideas. The Council say they can release no information about the conceptual discussions between the Council and Network Rail. Their current plans are to submit the detailed planning appication by December 2013. This would pre-empt some issues, and give only the usual limited few weeks for consideration and none for conceptual and design discussions. The Council are not clear yet if they can secure agreement with the GLA to give more time for this. The need for a community public conversation now therefore continues.
+
The Council’s consultants Landolt & Brown [http://www.bbc.co.uk/programmes/p02png2q/p02pnhjr report on their workshop, including their slides.]<br>
 +
Some highlights:
 +
* the way the physical supports for Platform 3 are linked into the north side of the station Arcade building is still being investigated by the architects. This means there needs to be an extra workshop (so 4 instead of 3). Once the Platform 3 supports are clarified they can develop designs for the new buildings, and they will present them at the additional workshop during May, date to be announced.
 +
* their ideas developing for the art deco building on the corner of Blenheim Grove and Rye Lane indicate a preference for an extension of two floors on top of the existing building.
 +
* they reported that they are talking with Carl Turner architects about the plans for the Holly Grove buildings (Icelands & Hannah Barry Gallery), and expect those plans to be submitted at the same time as the station square and Blenheim Grove buildings (summer). But the Holly Grove buildings have been removed from the codesign process so the public is excluded from all information about those plans.
 +
* they showed a slide of Network Rail’s plans for new lifts to all 4 platforms, and said they were looking into these. It was not possible to examine these details to make any comments or ask probing questions.
 +
* they asked us in table discussion groups to report back on several questions including:
 +
- think about how the square should feel when you arrive during the day and at night.
 +
- what uses would you like to see in new premises in the square and Blenheim Grove corner building.
 +
- explain why anything should go in a particular place.
 +
- what could improve safety.
 +
- where could public WCs be located.
 +
- what gets left out but is important?
 +
If you want to respond to these points or any others about this station project email them at: peckhamrye@landoltandbrown.com.
  
===24th August 2013 - Hush House Supermarket at the Bussey building===
+
===11th April 2015 launch of Peckham Vision’s art deco installation===
Peckham Vision's exhibition was a feature in the new Hush House Supermarket, which was visited by hundreds of people. There were many discussions about the town centre and the station developments.
+
[[Image:IMG 5837 adj+crop 2400.jpg|thumb|right|300px]]
[[Image:IMG_9886 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
[[Image:IMG 5836 adj 2400.jpg|thumb|right|300px]]
[[Image:IMG_9893 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
At the event on 8th April, we launched Peckham Vision’s art deco installation. Here above the community made model of central Rye Lane, we had the images of the seven art deco buildings which are clustered around the station. The images floated in an ethereal fashion above the information displays of the exhibition about plans to develop, redevelop, and regenerate their place in the town centre. A pause for thought and reflection about the nature of the Art Deco Quarter in the town centre while the Council’s consultation proceeds inexorably towards a decision, possibly to demolish enough of the cluster to destroy this unique feature of Peckham. The installation was co-created by Corinne Turner, Clyde Watson, Sam Watson, Geoff Frosh, Eileen Conn, Benny O’Looney.
[[Image:IMG_9896 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
[[Image:IMG 5846 adj 2400.jpg|left|180px|thumb displays]]
[[Image:IMG_9897 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
[[Image:IMG 5853 adj 2400.jpg|left|180px|thumb displays]]
<div style="clear:both;"></div>
+
[[Image:IMG 5854 adj 2400.jpg|left|180px|thumb displays]]
[[Image:IMG_9902 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
[[Image:IMG 5855 adj 2400.jpg|left|180px|thumb displays]]
[[Image:IMG_9909 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
[[Image:IMG 5861 adj 2400.jpg|left|180px|thumb displays]]
[[Image:IMG_9910 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
[[Image:IMG 5867 adj+skw 2400.jpg|left|180px|thumb displays]]
[[Image:IMG_9912 - Hush House at the Bussey building.jpg|left|190px|thumb displays]]
+
 
<div style="clear:both;"></div>
 
<div style="clear:both;"></div>
  
===Arches Open Studios 28-30 June 2013===
+
===8th April 2015 Protect Peckham's Future community event===
Peckham Vision's mobile exhibition was there all weekend at The Arches open studios. We leafleted all residents and businesses in Blenheim Grove in advance. Several visited the stall over the weekend, and learnt the latest information about the station area development, and discussed the issues in Blenheim Grove for residents and for businesses.
+
[[Image:Protect_Peckhams_Future_scrn_grab.jpg|thumb|right|150px]]
[[Image:IMG_9010 - PV at The Arches Open Studio.jpg|left|210px|thumb displays]]
+
'''Reports:'''
[[Image:IMG_9016 - PV at The Arches Open Studio.jpg|left|210px|thumb displays]]
+
* [[Media:Derek Kinrade RYE LANE.pdf|Rye Lane commercial history: talk by Derek Kinrade]]
[[Image:IMG_9021 - PV at The Arches Open Studio.jpg|left|210px|thumb displays]]
+
'''Pre-information:'''
[[Image:IMG_9028 - PV at The Arches Open Studio.jpg|left|210px|thumb displays]]
+
This event will cover art deco buildings, cultural economy, arts, music, architecture, commerce and more. This will be a community discussion about the changes in Peckham, what we all think about them, if they are good for our neighbourhood, and whose neighbourhood is it anyway? The discussion could touch on the impact of:
<div style="clear:both;"></div>
+
* rising housing prices, regeneration, gentrification, loss of social housing.
[[Image:IMG_9036 - PV at The Arches Open Studio.jpg|left|210px|thumb displays]]
+
* heavy handed redevelopment wiping out local micro economies.
[[Image:IMG_9039 - PV at The Arches Open Studio.jpg|left|210px|thumb displays]]
+
* tall buildings in Peckham & and loss of Peckham's character.
[[Image:IMG_9040 - PV at The Arches Open Studio.jpg|left|210px|thumb displays]]
+
* possible demolition of almost half remaining art deco buildings in Rye Lane cluster.
[[Image:IMG_9041 - PV at The Arches Open Studio.jpg|left|210px|thumb displays]]
+
Drop in at the exhibition in both PV and CLF studios any time from 3pm:
 +
* latest news on key regeneration projects, & info on Peckham's history.
 +
* Peckham Vision Art Deco installation.
 +
* Exhibition of CLF history, role, music & creativity.
 +
[https://www.facebook.com/events/394931794020114 More information]
 +
 
 +
==2015 January-March==
 +
 
 +
===23rd March next stages of the station co-design consultation===
 +
There will be 4 'periods' in the process.
 +
* 17th March    Period 1 – CoDesign the Brief
 +
* 16th April    Period 2 – Review options
 +
* W/C 18th May  Period 3 - Emerging proposals
 +
* Mid June      Period 4 – Planning, leading to submission of planning application.
 +
For information on what will be covered in each period [[Media:Pkm_Station_CoDesign_timetable.pdf|SEE HERE.]] <br>
 +
It appears that '''decisions on the following major issues may be taken in Period 2 around the end of April:'''<br>
 +
* the extent of the demolition or refurbishment in front of the station and the corner of Blenheim Grove and Rye Lane,  
 +
* location or relocation of existing tenants; location of public toilets, taxis, buses and drop-off’s; greening extent & character.
 +
 
 +
===17th March Peckham Rye Station square codesign workshop===
 +
'''Outcome:''' This 'workshop' reintroduced everyone to the project and explained the timetable going towards the planning application. Then the 100 or so people in 7 groups shuffled the 30 Aspirations into their top 13. Those 7 x 13 top ones will feed in to the architects' work to be reported week commencing 13th April.[http://peckhamcodesign.org/co-design-workshop-01/ Consultants' report from workshop here.]  <br>
 +
'''Publicity:''' Southwark Council email with latest news about the Station Gateway developments:
 +
“Landolt + Brown have been appointed to take forward the designs for Peckham Rye Station square. The Peckham Rye Station square project has been commissioned by Southwark Council in partnership with the Greater London Authority to transform the area around the Station. The project will create a new square as a focal point for the community, and include new and refurbished buildings to make the area more uplifting and less congested. The first co-design workshop of the design stage will be held on Tuesday 17th March 2015 at 6.30pm at All Saints Church Hall on Blenheim Grove (see map below). We want to build on the co-design work previously undertaken and hear from you about how we can work together as the project moves forward. The project design team, led by architects Landolt + Brown, would like to explain some of their initial thinking and observations in the first part of the workshop. This will be followed by a presentation from the Council on associated town centre projects. Please join us." <br>
 +
* [https://twitter.com/PeckhamCoDesign/status/573879417589624833 Click here for flyer and map] <br>
 +
* [https://www.facebook.com/PeckhamVision/posts/902427993113398 Further information about the Station and other town centre developments.]
 +
 
 +
===13th March Station codesign - Questions to ask, Issues to watch===
 +
'CoDesign' for Peckham Rye Station starts again 17th March 6.30pm-8.30pm, at All Saints Hall, Blenheim Grove.
 +
Main topics now include:
 +
* the design for the station square.
 +
* whether the Rye Lane corner buildings on Blenheim Grove and Holly Grove (Iceland), and 4 Holly Grove (Hannah Barry Gallery) will be demolished to be replaced with tall buildings.
 +
* preservation of the Art Deco cluster of buildings.
 +
* what Network Rail are planning for Dovedale Court.
 +
* what Southern Rail are planning for improved access to the platforms.
 +
* where the public toilets will be.
 +
* and more…
 +
If you want to hear the latest and contribute to the discussion, come along on Tuesday 17th March 6.30pm
 +
 
 +
===3rd March 2015 Update on the Station developments===
 +
* There has been news from Brixton where Network Rail are planning a clear out of what are reported as successful long-standing businesses in railway arches for 'refurbishment', with promises of returning. It sounds familiar from a year ago at Peckham Rye station. This approach may yet return to Peckham as Dovedale Court and the Holly Grove buildings were not covered by the 'co-design' consultation that was conducted last Autumn. So it seemed worth remarking on that somewhere: see [http://goo.gl/S1ZZkK Peckham Vision letter to SLP.]
 +
 
 +
* We may know more once the next 'co-design' process starts. The new station 'co-design' architects, Landolt & Brown, were [http://www.southwark.gov.uk/news/article/1908/architect_chosen_for_peckham_station_square_project announced on 9th February] But there is still no news from them or the Council on how they are going to conduct the 'co-design' of the brief for developing the planning application, or what the new timetable is.
 +
 
 +
* Landolt & Brown were the architects hired by the Council and Network Rail in 2012, and they produced the option that became the 'preferred option' which was clearance of the whole site. The new architects Weston Williamson then used that option to develop the proposals for the planning application. They presented those proposals in January 2014 at the Rye Lane Chapel meeting, and they were strongly rejected by the many local people there.
 +
 
 +
* After that the idea of co-design was proposed by the deputation to the Council about the way forward. The idea was to have constructive and informed public discussions about the future of the whole of the Network Rail land around the station and the feasible options for it. Sadly the co-design process that finally took place last September and October was not that at all as it was focussed on details of the appearance of the new square in front of the station.
 +
 
 +
* This was an unexpected and disappointing outcome of what had  been thought a promise to have a more collaborative process for developing ideas for the site as a whole. It leaves undiscussed the future of Dovedale Court, and the buildings in Holly Grove, and how it all fits into the town centre itself.
 +
 
 +
===20th February 2015 Co-Design shrinks to small consultation===
 +
[[Image:SLP full letter IMG 5356 adj 2400 lo.jpg|right|300px|thumb displays]]
 +
from Eileen Conn, Coordinator, Peckham Vision:<br>
 +
''Dear SLP Letters,<br>''
 +
''You reported (13 February) the appointment of the architects for the design of a new square in front of Peckham Rye station, and asked for comments on the priorities. One priority is to hear what is happening about the plans for the buildings on Holly Grove, and in Dovedale Court behind the station. Both these areas were a key part of the site to be wholly demolished in the previous plans. The plans were stopped to enable a 'co-design' process where local people could engage in serious discussion about the options for all the different parts of the site.<br>''
 +
''It was perplexing to discover last autumn that the 'co-design' process had shrunk to a 'consultation' just about the design of the small area in front of the station. This defeated what we thought had been agreed last year for local people to take part in thinking about the whole site around the station on the west side of Rye Lane, and how it fits into the self regenerating dynamic of that part of town.<br>''
 +
''The silence on what is happening on the Holly Grove and Dovedale Court arches is worrying when we see the reports of Network Rail's plans to demolish and clear out the successful vibrant arches in neighbouring Brixton, and Herne Hill. It raises the same questions we wanted to explore in the 'co-design' - why does anyone think of demolishing an area to regenerate it when it is already self regenerating successfully, and in Brixton's case already self regenerated?
 +
''
 +
 
 +
===9th February Architects announced===
 +
 
 +
[http://www.southwark.gov.uk/news/article/1908/architect_chosen_for_peckham_station_square_project Council announced the appointment of [http://www.landoltandbrown.com/ Landolt & Brown] as the station square architects. 11 days later (19 February) there has been no news of the timetable or when local people will be allowed to say anything at all about either the consultation process or the design of the new square and buildings. This is the [http://www.peckhamvision.org/wiki/images/a/a4/20141202_Briefing_GTP.pdf brief for the contract.]
 +
 
 +
===25th January architects selected===
 +
Four architects Ash Sakula Architects, Weston Williamson & Partners, Landolt & Brown, Henley Halebrown Rorrison were shortlisted and interviewed on 14th January. Two self nominated residents were part of the shortlisting and interviewing panel. The result is expected to be announced by end January. A public meeting is planned for early February in Peckham Vision Bussey exhibition studio on the process, the news and the way forward.
 +
 
 +
==2014 October-December==
 +
 
 +
===9th December: Architects meet residents during tender period===
 +
 
 +
[[File:IMG 4599 adj2 2400 lob.jpg|thumb|right|250px|architects meet the CoDesigners]]
 +
Nine architects have been invited to [[Media:20141202_Briefing_GTP.pdf|tender for the contract]] to develop the design and planning application for the Peckham Rye Station development project. These are: Ash Sakula Architects, Weston Williamson & Partners, Landolt & Brown, Sarah Wigglesworth, Adam Khan Architects, Cottrell & Vermeulen (local consortium), Duggan Morris Architects, Peter Barber Architects, Henley Halebrown Rorrison. Submissions have to be made by 23rd December, and the architects will be selected in the early part of January. At Peckham Vision’s suggestion, the Council invited the nine firms to meet on 9th December some 40 of the CoDesigners while they are developing their submissions. This event was held in Peckham Vision’s studio in the Bussey Building, and was a successful first in bringing residents and architects together at this early stage.<br>
 +
''website malfunction - pics to be uploaded again''
 +
[[Image:IMG_4599 adj2 190px - Architects meet CoDesigners at PV event.jpg|left|190px|thumb displays]]
 +
[[Image:IMG_4607 adj 190px - Architects meet CoDesigners at PV event.jpg|left|190px|thumb displays]]
 +
[[Image:IMG_4613 adj 190px - Architects meet CoDesigners at PV event.jpg|left|190px|thumb displays]]
 +
[[Image:IMG_4634 adj 190px - Architects meet CoDesigners at PV event.jpg|left|190px|thumb displays]]
 +
[[Image:IMG_4646 adj 190px - Architects meet CoDesigners at PV event.jpg|left|190px|thumb displays]]
 
<div style="clear:both;"></div>
 
<div style="clear:both;"></div>
  
===Revised map of properties in the station plans June 2013===
+
===19th November: WEEKLY meetings continue===
The map attached to the Council June report (see previous news it) gives further details of the position relating to the possible plans for properties adjacent to the new square and to the station building. This latest news is reflected in this revised Peckham Vision map [[Image:Appendix 1 Gateway to Peckham Map - A3 coloured v.08.jpg|right|thumb|650px|]]. The colours refer to:
+
The Atlas of Aspirations LINK has been submitted to the Council. This will accompany the tender document about to be sent in the next few weeks to architects who are interested in bidding for the contract for the Council’s plan to develop the building around the station. In the meantime, local residents who volunteered to help produce the WEEKLY publication on the CoDesign material continue to meet on [http://peckhamcodesign.org/weekly-editorial-meetings Tuesday evenings 7-9pm, now in All Saints Hall] behind the church opposite Bar Story in Blenheim Grove.[http://peckhamcodesign.org/weekly Two of the Weeklies have been produced and another 6 are in preparation.] As well as editing the WEEKLY publications the Tuesday evening meeting is also the place where issues that have arisen and are arising, about the station development and about the process, are discussed
 +
 
 +
===10th November: Atlas of Aspirations v2 completed===
 +
* [http://goo.gl/y4rLBN draft Atlas out for comments]
 +
* [http://peckhamcodesign.org/eileen-conn/#comment-237 some comments on draft]
 +
* [http://peckhamcodesign.org/wp-content/uploads/2014/11/Atlas01.pdf completed Atlas submitted to Council]
 +
 
 +
===5th November: deadline for comments===
 +
The CoDesign process is ending this week. An 'Atlas of Aspirations' is being prepared, by the Council's CoDesign consultants Ash Sakula, summarising 'outcomes and findings' of the CoDesign process. The draft Atlas is here: http://goo.gl/y4rLBN. The deadline for Comments is WED 5th NOVEMBER.
 +
* Ash Sakula will submit the Atlas to Southwark Council at the end of this week. They say:  ""''We need YOU...to give us feedback on the DRAFT ASPIRATIONS. Email us with your top 10 Aspirations from the list. If you feel that any Aspirations are not clear enough or that there are any Aspirations that have not been represented then please email with your comments and feedback.""'' Email: contact@peckhamcodesign.org
 +
* The Council's consultants will be giving an update to the Peckham Community Council on Monday 10th November 7pm at Peckham Academy. Agenda: http://goo.gl/QZHhAO
 +
* The CoDesign remit has been limited to the creation of a square in front of the station between the two rail viaducts. This has been a surprise as it left out the development issues that caused local people to protest very strongly in early 2014 against proposals put forward by Network Rail.
 +
* It has emerged that plans are still being developed for the rest of the site, including new taller buildings on Blenheim Grove and Holly Grove.
 +
* Comments on the other parts of the site and how it fits together have been recorded by the consultants. So if you have views on any of the site development and the area surrounding it,send them in as points to take into account in the Atlas. Email: contact@peckhamcodesign.org
 +
As time is now very short, here is a summary list of topics that have stimulated comments, and which you can use to check if you have anything further you wish to say or need to be reflected in the Atlas:
 +
* Design of the new square, & services & facilities, including public toilets.
 +
* The station building & access to the station platforms.
 +
* Future of Holly Grove & Blenheim Grove commercial buildings.
 +
* Preserving & restoring the cluster of Art Deco buildings in that area.
 +
* Future of Dovedale Court and improving forecourts in Blenheim Grove.
 +
* Opening up Eastern arches, & green pathways along the rail lines towards Queen's Rd station.
 +
* Public realm in central Rye Lane around the station site.
 +
* Need for integrated town planning.
 +
Links for more information on some of these in thinking about your comments:
 +
* Other local residents' comments: http://goo.gl/mQ0yo9
 +
* Art Deco Quarter: http://goo.gl/xkBfDi
 +
* Green Paths: http://goo.gl/TD29p1
 +
 
 +
===October 2014 Blenheim Grove corner feasibility study===
 +
In October 2014, the Council commissioned Weston Wiliamson & Partners to carry out a feasibility study for replacing the existing art deco building at 82 Rye Lane & 2-10 Blenheim Grove. [http://peckhamcodesign.org/legacy/wp-content/uploads/2014/10/Capacity-Study-_Blenheim-Grove-17102014.pdf '''The report on this is HERE'''.] It concludes that four storeys is the optimum height for a new building. The question which was subsequently asked in the co-design process at this stage was whether the benefits of such a new building justified its cost, disruption and loss of the art deco quarter.
  
* Station Arcade (deep blue), and the buildings (paler blue) on the other sides of the rail lines there.
+
===September - October Some CoDesign comments===
* Holly Grove & Blenheim Grove (pink): the buildings fronting these two streets & fronting the station forecourts under the rail-tracks adjacent to either side of the station building.
+
Here are some extracts from comments posted up on the CoDesign website:
* Rear of the station (green): the rail arches, their forecourts and access road from Blenheim Grove.
+
* The Arches (yellow): the rail arches beyond the potential rear market with separate access from Blenheim Grove.
+
  
The agreed plan is to remove the buildings in Station Arcade (deep blue) to recreate the public square, and to create a path from front to rear of the station at ground floor level within the station building to connect the new front square and a possible new rear market.  The buildings (in paler blue) may need to be removed because of the way they are connected through the arches to the Arcade. The buildings in pink are less likely to be affected. The paler green shade indicates the arches with forecourts on Blenheim Grove; and the darker green those arches between the railway lines. There is no information about the plans for any of these arches behind the station. The Council and Network Rail say they will consult the public on the plans for the whole site in 2014. Because there are no Council plans to enable public discussion about design ideas of all this before that stage, Peckham Vision is continuing with the public conversation about the possibilities. The information was displayed by Peckham Vision at the weekend Open Studios in The Arches over the weekend of 28 – 30 June [see photos above]. We leafleted all residents and businesses in Blenheim Grove in advance, and several visited the stall over the weekend.
+
* I think we need a coherent plan for the whole area owned by Network Rail rather than a bitty approach. Personally I think all that needs to happen is a bit of painting and tidying up. We don’t need any new tall buildings and I think we need to preserve the Art Deco buildings around the station. I think Dovedale Court and its businesses should be protected. Maybe just open out the front of the station a bit but please keep businesses that have been in Peckham for years! There is no need at all to turn Peckham into Clapham- peckham is beautiful as it is, it just needs a lick of paint. [https://www.facebook.com/PeckhamVision/posts/830105447012320 Olivia Brambill]
  
===Revised Council position on station plans June 2013===
+
* Why are the development issues that caused local people to protest very strongly in early 2014, against proposals put forward by Network Rail, not part of the scope of the Co-Design process? Planning issues in the central Peckham area need to be looked at in an integrated way. Extract from [http://peckhamcodesign.org/24102014-local-opinion-sally-mcintosh-kevin-obrien Sally Mcintosh & Kevin OBrien]
Following the deputation the Cabinet decision was ‘called in’ by the Overview Scrutiny Committee [http://moderngov.southwark.gov.uk/documents/g4339/Printed%20minutes%20Tuesday%2007-May-2013%2018.00%20Overview%20Scrutiny%20Committee.pdf?T=1 see pages 2-7 of meeting verbatim report.] As a result of that [[Media:13.06.26 Gateway to Peckham - Public Square and Station Regeneration - Officer response to Overview and Scrut.pdf|a further report]] and [[Media:13.06.26 Appendix 1 Map (1).pdf|map]] was made to the Cabinet by Cllr Fiona Colley. This is an extract: “This report follows up a number of issues raised regarding our Gateway to Peckham cabinet decision in April. Unfortunately the original recommendations of that report indicated that the council intended to buy out all interests across a far larger area than we in fact intended. Although this was clarified at the meeting and the recommendations amended, some confusion remained and the report was called in to scrutiny.<br>
+
I'd like to thank Overview and Scrutiny Committee for their decision not to refer back the decision to cabinet and for their constructive recommendations. We are through this report taking the opportunity to clarify the extent of the area in which the acquisition of all interests is required. We also recommend agreeing the other two recommendations and that cabinet should receive a further report and recommendations when investigations of models of partnership arrangements is
+
complete.<br>
+
Since the last report I have taken the opportunity to visit a number of the cultural businesses who were concerned about their future. I hope I have provided them with a level of reassurance that far from wishing to evict them from the area, that the Gateway to Peckham project is an opportunity to build on the best that Peckham already has to offer and create an arts, culture and leisure hub that will create jobs and business opportunities and be an exciting new destination in London.
+
  
===Opening the discussion about the possible changes on the site April 2013===
+
* The new opened space in front of the station will be a core part of the town centre. So its design needs to take into account fully how it will function socially, physically, commercially and economically in relation to the area close by – notably Elm Grove, Holly Grove, Blenheim Grove, Rye Lane between Elm Grove, Cinema/Moncrieff Place, Bournemouth Road and the future potential developments in the eastern arches. We need to develop an overall holistic town centre plan for this central Rye Lane area for the day, evening and night time economies. Extract from [http://peckhamcodesign.org/eileen-conn/ Eileen Conn]
[[Image:Appendix 1 Gateway to Peckham Map - A3 coloured v.06.jpg|right|thumb|650px|]]
+
We have produced, as a discussion aid, this illustrated map of the station. It is based on the map in the [http://moderngov.southwark.gov.uk/mgAi.aspx?id=27873 Cabinet report.]  The colours are broad brush indications of different parts of the site and not precise boundaries. They show how the different parts might relate to the regeneration ideas, so it can help us all to know what we are referring to in discussion. The colours refer to <BR>
+
* Station Arcade (blue): the buildings between the rail lines in front of the station building.
+
* Holly Grove & Blenheim Grove (pink): the buildings fronting these two streets & fronting the station forecourts under the rail-tracks adjacent to either side of the station building.
+
* Potential rear market (green): the rail arches, their forecourts and access road from Blenheim Grove.
+
* The Arches (yellow): the rail arches beyond the potential rear market with separate access from Blenheim Grove.<BR>
+
The agreed plan is to remove the buildings in Station Arcade to recreate the public square, and to create a path from front to rear of the station at ground floor level within the station building to connect the new front square and a new rear market.  There is no information on ideas or plans for other buildings or parts of the site. We had understood that there would be public consultation and discussion about the design of all this before decisions on design and final plans are made. But the process is currently not known. <BR>
+
In the meantime lots of people want to know more and discuss different aspects of it so we hope that the map we have produced will be useful for that, and for clarifying what the range of possibilities may be. We will be glad to respond to any queries to help the discussion along.
+
  
===PV Deputation to Cabinet to stop wholesale clearance of businesses on station site 16 April 2013===
+
===September - October 2014 CoDesign Process for comments===
We had a shock in discovering a Council report for 16 April 2013 which seemed to recommend a total clear out of the businesses on Network Rail land around Peckham Rye station between Rye Lane and Bellenden Rd. [http://moderngov.southwark.gov.uk/mgAi.aspx?id=27873 See the report and map] It had been expected that some businesses would be displaced by the plans to recreate the station square and reclassify the industrial land behind the station for town centre commercial use, and that for the rest there would be an organic process of change. No one expected that everything would be swept away to create a sterile place which would have to start all over again.
+
Comments have been contributed in a variety of ways:
[[Image:25-04-2013 SNews article - Council's Peckham plans are pants - inset photo.jpg|right|thumb|300px|The Peckham Graces]]
+
* in the [http://peckhamcodesign.org/about/ shop at the station] in interviews, and on cards;
[[Image:25-04-2013 SNews article - Council's Peckham plans are pants - main photo.jpg|right|thumb|300px|The Peckham Graces]]
+
* visits by CoDesign staff to local groups, traders and people;
Peckham Vision took a deputation to the Council Cabinet meeting on 16 April at Council HQ 160 Tooley St, for clarification, and if it was a plan for wholesale clear out to seek a postponement for urgent discussions about a different approach. The room was packed with supporters from Peckham. It was nerve wracking but we won! The report had said the Council was working to secure 'vacant possession' across the whole site. After our reprsentations, the top councillors said they had no intention of clearing the whole site and going for ‘vacant possession’ of it all. They said the report was not well drafted. Council had wanted the blanket authority to do what they wanted. They didn’t get it. The community was united to protect the key local enterprises of the future. So it was a great result, with a united community, and the drastic plan appeared dead. Our vision of an integrated sustainable Peckham is still alive. But there is much hard work still ahead to keep watch and to nurture our Peckham.
+
* by email to CoDesign;
 +
* on the [http://peckhamcodesign.org/commonplace/ CommonPlace map;]
 +
* at the [http://peckhamcodesign.org/weekly/ Weekly Editorial] in the shop at the station;
 +
* on the [http://peckhamcodesign.org/codesigners/ CoDesigners webpage] on the CoDesign web site;
 +
* some of these comments have been posted on the [http://peckhamcodesign.org/about/diary/ CoDesign website Blog page].
  
While the deputation was presenting its case to the Cabinet meeting, young artists supporters from Peckham created a pop-up art performance in the lobby of Southwark Council. This was a tasteful inspiring illustration of the free independent spirit of the creative economy in Peckham which needs gentle nurturing and not a heavy handed regeneration site clearance.<BR>
+
===Thursday 16th October Community exhibition & Peckham Society symposium===
 +
[https://www.facebook.com/events/802613536469896/ THURSDAY 16th OCTOBER 4pm Exhibition. 7-9pm Forum with slide show: the Peckham Society's annual symposium, jointly presented with Peckham Vision]<br>
 +
* [https://www.facebook.com/PeckhamVision/posts/824812007541664c Picture of the symposium]
 +
* [https://www.facebook.com/PeckhamVision/photos/a.373677405988462.83282.373651479324388/825387237484141/?type=1 Display panel of the Art Deco quarter launched at the event.]
  
 +
===Tues 7th October Community Discussion: Re-imagining Peckham Rye station area===
 +
[https://www.facebook.com/events/1487617611509404/ This event on 7th October 6-9pm] was the first in our new temporary exhibition studio space, and was busy from the moment the doors opened. It displayed the community model of central Rye Lane, and also the Nicholas Cobb model of the [https://www.facebook.com/PeckhamVision/posts/820786717944193 multi storey car park in 100 years after some cataclysmic event.] The Peckham Vision mobile exhibition displays were available as were specially produced wall displays of photos, maps and diagrams, about the station area, collected from a variety of sources including local people's imaginative sketches. They all supported lively discussions between local residents re-imagining the buildings and the spaces around the station.
  
See media reports:
+
==Earlier dates 2007 - 2014==
;Southwark News 25 April 2013:
+
Click here for earlier dates:  
*[[Media:25-04-2013 SNews article - Council's Peckham plans are pants - whole page.pdf|25-04-2013 SNews article - Council's Peckham plans are pants - whole page.pdf]]
+
  
;South London Press 23rd April 2013:
+
'''April 2007 – January 2013''' http://www.peckhamvision.org/wiki/Peckham_Rye_Station_stages
*[[Media:23-04-2013 - SLP article - Total Clear Out of Small Businesses - scans.jpg|23-04-2013 - SLP article - Total Clear Out of Small Businesses - scans.jpg]]
+
  
;ARTWEEKLY website post:
+
'''April 2013 to November 2013''' http://www.peckhamvision.org/wiki/Peckham_Rye_Station_Gateway/2011-2013
*[http://artweekly.tumblr.com/post/48228072817/naked-people-are-protesting-in-peckham Naked People Are Protesting In Peckham]
+
<BR>
+
<BR>
+
  
===Original station square to be restored November 2011===
+
'''January – September 2014''' http://www.peckhamvision.org/wiki/Peckham_Rye_Station_Gateway/Jan-Sep_2014
On 23rd November 2011, [http://www.london.gov.uk/priorities/business-economy/investing-future/mayors-regeneration-fund/other-areas the London Mayor announced] that Peckham would receive between £4m-£5m from the Mayor’s £70m Regeneration Fund, which was set up to help repair the damage caused by the August 2011 riots. Southwark Council has said it will match fund the project to restore the open square in front of the station, and transform the spaces around the station in the middle of the town centre. [http://www.londonlovesbusiness.com/news/peckham-plans-to-boost-economy-and-create-jobs/1109.article Read more comment] and [http://www.thisislondon.co.uk/standard/article-24015134-pound-5m-plaza-will-say-welcome-to-peckham.do Evening Standard] The proposal for this project was able to be put together by the Council to meet the GLA's very fast timetable immediately after the riots because of all the work that had already been done by Peckham Vision, the Peckham Society and the Rye Lane & Station Action Group in collaboration with the Council over several years. The Southwark News reported it as recreating the 'Grand entrance’ for the Victorian station. [[Media:11.12.01_SNews_024.STH.MAIN.001.COL.pdf|Read the article here.]] The Council are now working on the details of the plans, and discussing with Peckham Vision the way the community work on the station and surrounding area can be aligned with those.
+

Latest revision as of 02:00, 7 March 2020

See also

Contents

Gateway project key documents:

Some key official documents about this station redevelopment project were released under Freedom of Information in August 2013. These can be found here (at Item 5) along with some commentary papers by Peckham Vision on the issues raised by the project. Details of all the stages in the development of this project are below in date order.

To be incorporated below
- Planning application for the Station Sq & Blenheim Grove now submitted
- Council/Network Rail CoDesign statement Feb 2014: promising 'local people full partners in shaping scheme'
Peckham Vision is NOT and never has been part of Southwark Council, nor part of any organisation that has a contract with the Council to deliver any project. The 'co-design' consultation projects are run by commercial architects as Council's agents. Peckham Vision has had no role in how the projects are designed or run.

July 2016 Council weblinks on this page

Council planning weblinks have all changed. It will take some time to restore all the links. If the link on this page you want is part of the PNAAP process and is broken you can find the adopted Peckham & Nunhead Area Action Plan (PNAAP) here http://www.southwark.gov.uk/downloads/download/4444/area_action_plans The Council says you can also access it from the Area Action Plans page by clicking on the relevant link, along with the supporting and background documents here: http://www.southwark.gov.uk/info/200211/area_action_plans which can be accessed from the main planning policy page on the left hand side.

20.02.18 Peckham Community Rail Event (With Logos).jpg

2020

March 2020 follow up to Public Meeting

The meeting spaces were booked out and people were turned away at the door. Though this was unfortunate, it showed the rail companies how significant were the issues about the station when so many people turned up in poor winter weather. Network Rail have sent to all who left their email addresses for the meeting a copy of the several rail companies' slide presentations, see here. They have also compiled a table showing their responses to all the points raised in the meeting. They have agreed to hold regular events with the community to get further input from rail and station users as the redesign for improving accessibility develops. Network Rail representatives have agreed to come to Peckham Vision's Open Studio on Saturday 14th March 2020 12pm-5pm drop-in.

18th February 2020 Public Meeting

IMPROVING PECKHAM RYE STATION ACCESSIBILITY - We know that Peckham Rye station is very inaccessible for anyone who has difficulty with stairs or has luggage or prams or small children. The rail industry has plans to change this. They are holding a public meeting on TUESDAY 18th FEBRUARY 7-9pm at All Saints Church, Blenheim Grove. The invitation says the meeting is about:

  • How to make Peckham Rye Station accessible
  • Agenda: • Update on the current station building. • Updates on train services provided today. • Long term growth and strategy to improve the rail service. • Plenty of opportunities to ask questions and talk to the following rail companies: • Network Rail, Transport for London (for London Overground services), Govia Thameslink Railway (for Southern and Thameslink train services), Southeastern

For more information and to book for a free ticket click here: http://www.tinyurl.com/rfydqn5

2019

March 2019 work starts

Work has started on Phase 1 the reconstruction of the building on the corner of Blenheim Grove and Rye Lane to create new commercial units on the ground and first floors, and two new floors for work spaces above. The creation of the space between the viaducts will start when that Phase 1 work has progressed and the plan is to complete it by 2021. Further details from the Council are here.

January-March 2017

13th February 2017 Community discussion

Peckham Vision arranged a discussion of the Kaizen review report to enable people who had been involved in the co-design process for the Station or Library Squares to see if there was anything to add to the report and to discuss the follow-up actions. Jonny Zander from Kaizen Consultants, the author of the report, was present and took part in the discussion. The notes from the meeting are here.

12th January 2017 Council drop-in update

The Council will hold a drop-in event at former Barry's Café 3 Station Way for the latest news on:

  • Programme for construction of the new square and the redevelopment of the Blenheim Gove/Rye lane corner building.
  • Relocation of the businesses.
  • Progress with the Compulsory Purchase Order (CPO)
  • Update on the Co-Design Review

More Council information: about the event, and about the development The review report was available at the drop-in and is now on-line. Information is awaited from the Council about the follow up.

October-December 2016

Review of Co-design process

Consultants Kaizen conducted a review of the two co-design exercises. Their report will be published on 10th January 2017. The consultants will be available to discuss the report at the Council consultation drop-in on 12th January 4-8pm at 3 Station Way. Some submissions to the consultants' review commenting on the co-design projects are available here: Eileen Conn, Clyde Watson. Some main comments are that much more work needs to be done to agree what co-design should mean in practise and how it should be conducted. Co-design is part of a set of mechanisms to bring about collaboration between different stakeholders. Successful collaboration cannot be imposed and so agreement on the remit and parameters of a co-design process seem essential. Also for successful codesign with communities a parallel process for communities to share and discuss the ideas and the work seems an important ingredient. None of this was present in the Peckham projects and their absence had a negative effect on the experience and the outcome. The review was conducted after local deputations to the Cabinet, Community Council and Planning Committee. To learn the lessons adequately, it will be essential for the community to be effectively engaged in discussing and reviewing the consultant’s report into the process - as part of the Council's development of its response. Otherwise the key lesson about collaboration will still not have been learnt.

Co-design process 2013-2016

Introduction

Following the rejection by the community in January 2014 of the Network Rail / Council plans for the Station Gateway site redevelopment, the Council adopted the suggestion made by the residents' deputation that there should be a rethink using a 'co-design' process. This new process was put to tender and the first phase began in June 2014. In December 2014 alongside the Station co-design process, the Council started a 'co-design' consultation on development ideas for the Peckham Library Square including the Peckham Arch and 91-93 Peckham High Street. The section below outlines the phases of the co-design process for both the Station and the Library Square projects. The experience of those who took part in various roles is now (October 2016) being reviewed by Council consultants.
Complete their survey here: https://www.surveymonkey.com/r/SouthwarkCoDesignReview The survey is now closed.

Summary of process stages

PECKHAM RYE STATION DEVELOPMENT

Background The lead up to the Co-Design process started in 2013 when there were indications that the Council was planning to seek possession of all Network Rail’s land around the station at once so clearing out all the businesses. This led to two deputations to the Council April 2013 and October 2013 and a Scrutiny Committee May 2013 seeking clarity about this. The Council said that was not the plan. But when the plans were unveiled at a public meeting in January 2014 it turned out that was the plan. The community rejection of the plan at that public meeting in Rye Lane Chapel led the Council to agreeing to hire new consultants to redesign the plan for the whole Gateway site involving the community, through a ‘Co-design’ process. Ash Sakula architects were appointed in June 2014. Because of this long community background which was led by Peckham Vision, this website has a detailed record of the process until September 2014, when the co-design process started. Thereafter, it is less detailed, and needs to be read in conjunction with the co-design web links. There were inadequacies in the whole process of 'co-design' which meant that a number of important matters were not adequately discussed during the process. This led to many objections to the detailed planning application which were unresolved when the plans were approved in March 2016. The list of events and happenings that were recorded at the time on this webpage can be viewed at the beginning of the following pages. Click on an item in any of the lists to view the entry for that item.

Co-design first phase - Ash Sakula, June to October 2014:
Peckham Rye Station Co-design Digital Communications:

Timeline:
[July 2014 Peckham Vision launched the community built model of the station area at a public community meeting in Bussey Building.]
July 2014: Ash Sakula arranged event in Peckham Liberal Club for (about 30) residents to meet them.
August 2014: Ash Sakula launch the co-design project on roof of multi storey car park.
September–October 2014: Ash Sakula co-design process in operation including:

  • Events during the week in the station forecourt and at foot of the old staircase, and ‘Weekly’ meetings on Tuesday evenings for creating a weekly publication.
  • Some meetings in All Saints church hall on different topics.
  • A digital ‘Commonplace’ map inviting people to offer comments on places around the station and elsewhere in the town centre: http://peckhamcodesign.org/stn-sq-ph-1/commonplace
  • An email list of ‘CoDesigners’ for info about events and other co-design matters.
  • ‘Atlas of Aspirations’, a report bringing together different aspects from the CoDesign process.

Interim stage between the first and second phases, November 2014 to February 2015:

  • Council issues tender for work to draw up plans and planning application for new station square & Blenheim Grove corner building.
  • No information about the remainder of the other land and buildings around station, including Holly Grove, Dovedale Court and access to station platforms.
  • Four residents take part in architects selection process.
  • Interviews of shortlisted architects in January 2015.
  • Landolt & Brown architects appointed.
  • co-design shrinks to small consultation Letter to South London Press 20 February 2015.

Co-design second phase – Landolt & Brown, February 2015 to March 2016
Peckham Rye Station Co-design Digital Communications: There is no trace now of the website that was used in the second phase. The Facebook and Twitter pages set up in the first phase were continued in this phase.

Timeline:

  • 4 evening workshops with presentations of info about the issues and designs of the new station square and the building on the corner of Blenheim Grove and Rye Lane.
  • First workshop March 2015, final workshop in July 2015
  • Co-design disappointing
  • letter to Southwark News- "No 'co-design' for Peckham Rye station". 13 August 2015.
  • October 2015 planning application submitted
  • November meeting called by local resident to discuss concerns about designs.
  • March 2016 Planning Committee grant permission.

___________________________________________________________________

PECKHAM LIBRARY SQUARE

Background: After the Station co-design process had started the Council decided to use a co-design approach for the development of the Peckham Library Square and 91-93 Peckham High Street, which is all Council property. Peckham Vision's reporting of the Library Square co-design process is covered on Peckham Vision Facebook

Peckham Library Square co-design communications:

Timeline

  • December 2014 First evening event by Carl Turner Architects in Peckham Platform.
  • From January to November 2015 further six evening events where Carl Turner reported on design issues.
  • Proposal to remove the Peckham Arch emerges in first half of 2015.
  • Mountview development, also by Carl Turner, emerges during 2015.
  • Mountview planning application submitted and approved in September 2016.
  • Library Square planning application submitted August 2016, not yet decided.

11th October 2016 Co-design review

Council consultants start review of Peckham co-design process by web based survey. Deadline is 25th October. The Council's information message is: "Last year Southwark Council trialled a Co-Design approach to two development schemes in the town centre, Peckham Rye Station Square, and Peckham Library Square. The council is now keen to understand what you thought of the Co-Design process. The council have asked award winning social business Kaizen Partnership to carry out an independent review. We have commissioned this work to enable us to better understand how effective Co-Design was and what could have improved it. To gather as much information as possible, an online survey has been created. We would be very grateful if you were able to share your views and experience of the process through this short survey: https://www.surveymonkey.com/r/SouthwarkCoDesignReview Once the questionnaire responses have been evaluated, the Co-Design review will be shared not only across the council but will be publicly available and will be used to shape future projects in the borough, so we would be very grateful if you’re able to spare a few minute to contribute to this important piece of work."

April-September 2016

Preparatory work for buildings works

The Council is continuing with the preparatory work of negotiating the sale of leases and the preparation for compulsory purchase where sale not agreed. Public Inquiry is to be held in early 2017 for several objections. See here for details.

January-March 2016

1st March 2016 Planning permission

Blenheim Grove corner
new station square

On 1st March 2016 the Planning Committee gave permission to the plans to create the new square at Peckham Rye station and extend upwards two floors on the corner of Blenheim Grove on the basis of the proposals in the planning application. This was in spite of significant objections from a large number of objectors to the details proposed. This was evidence of a failure in the 'co-design' process, which local people say must be subject to an independent evaluation. Here are some comments on the planning proposals indicating the nature of the objections.

The planning report is available here. The Committee agenda and meeting details are here.

Watching the very poor implementation of the 'co-design' for the station developments was so exhausting and disappointing it interfered with our ability to keep the website updated on it. Some of the actions were posted on Peckham Vision Facebook.

October-December 2015

12th November 2015

South London locals question Landolt + Brown’s Peckham Rye station revamp

29th October 2015 Planning application submitted

The planning application from Landolt & Brown for the new square and changes in Blenheim Grove is now in. This is just for the area in front of the station and the building on the corner of Blenheim Grove & Rye Lane. From the planning website: Case number: 15/AP/4337: Provision of a new public square between Peckham Rye Station and Rye Lane, created by demolishing the arcade buildings currently located between the north and south railway viaducts. Refurbishment of the railway arches to provide commercial units facing onto the new square. Refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, hard landscaping and other associated works. Further information and documents. Information from Peckham Peculiar.

July-September 2015

A1 PV Panel 05 - Gateway - map v.13 - flat 1024.jpg

September 2015 'Co-Design' disappointing

The Co-Design process has been very disappointing. Following the wholly unacceptable plans from Network Rail in January 2014, local people suggested a co-design process to enable public discussions about the different parts of the whole site, and how they relate to the town centre. Unfortunately, it became instead just a consultation about design details of a small part of the site (pink on the map alongside - click to enlarge), and without addressing major issues which emerged in 2013 and 2014. Plans are being developed separately and without public discussion for the three other major areas of the site (blue, white and green). A planning application is expected in the autumn for the pink area, and possibly the other areas. There has been no monitoring and evaluation, and so no joint Council & community learning about the co-design process, its effectiveness or how it could be improved. See letter to Southwark News about this in August 2015, titled "No ‘codesign’ for Peckham Rye station".

29th July 2015 4th 'codesign' station workshop

This last event from Landolt & Brown the Council’s consultant architects was on the design of the new station square and at the building on the corner of Blenheim Grove and Rye Lane on Wednesday 29 July 6.30pm-8.30pm at the Thomas Carlton Centre, Alpha Street, SE15 4NX. (note the change of address.) For more see: http://us9.campaign-archive2.com/?u=25fd80cafe3952ad0b146376c&id=146e79bdc2&e=83ef0156b7 The presentation is here: http://www.peckhamryestationsquare.co.uk/section/presentations/

April-June 2015

24th-27th June 2015

Peckham Vision held an exhibition and here in Peckham Vision Bussey studio jointly with MArch students from Brighton University. A new display panel was included which gave an updated report on the Station Gateway project.

4th June 2015 3rd 'codesign' station workshop

The next PR Station Square workshop will be on 4 June at All Saints Church, more details here: http://tinyurl.com/lns6yyu Here is a report on the workshop from the architect consultants Landolt & Brown: http://www.peckhamryestationsquare.co.uk/presentations/summary-peckham-rye-station-square-codesign-workshop-03 The consultants said there would be a further workshop in July to report on the proposals for the square, and that they are aiming for a planning application to be put forward over the summer.

16th April 2nd 'codesign' station workshop

The Council’s consultants Landolt & Brown report on their workshop, including their slides.
Some highlights:

  • the way the physical supports for Platform 3 are linked into the north side of the station Arcade building is still being investigated by the architects. This means there needs to be an extra workshop (so 4 instead of 3). Once the Platform 3 supports are clarified they can develop designs for the new buildings, and they will present them at the additional workshop during May, date to be announced.
  • their ideas developing for the art deco building on the corner of Blenheim Grove and Rye Lane indicate a preference for an extension of two floors on top of the existing building.
  • they reported that they are talking with Carl Turner architects about the plans for the Holly Grove buildings (Icelands & Hannah Barry Gallery), and expect those plans to be submitted at the same time as the station square and Blenheim Grove buildings (summer). But the Holly Grove buildings have been removed from the codesign process so the public is excluded from all information about those plans.
  • they showed a slide of Network Rail’s plans for new lifts to all 4 platforms, and said they were looking into these. It was not possible to examine these details to make any comments or ask probing questions.
  • they asked us in table discussion groups to report back on several questions including:
- think about how the square should feel when you arrive during the day and at night.
- what uses would you like to see in new premises in the square and Blenheim Grove corner building.
- explain why anything should go in a particular place.
- what could improve safety.
- where could public WCs be located.
- what gets left out but is important?

If you want to respond to these points or any others about this station project email them at: peckhamrye@landoltandbrown.com.

11th April 2015 launch of Peckham Vision’s art deco installation

IMG 5837 adj+crop 2400.jpg
IMG 5836 adj 2400.jpg

At the event on 8th April, we launched Peckham Vision’s art deco installation. Here above the community made model of central Rye Lane, we had the images of the seven art deco buildings which are clustered around the station. The images floated in an ethereal fashion above the information displays of the exhibition about plans to develop, redevelop, and regenerate their place in the town centre. A pause for thought and reflection about the nature of the Art Deco Quarter in the town centre while the Council’s consultation proceeds inexorably towards a decision, possibly to demolish enough of the cluster to destroy this unique feature of Peckham. The installation was co-created by Corinne Turner, Clyde Watson, Sam Watson, Geoff Frosh, Eileen Conn, Benny O’Looney.

thumb displays
thumb displays
thumb displays
thumb displays
thumb displays
thumb displays

8th April 2015 Protect Peckham's Future community event

Protect Peckhams Future scrn grab.jpg

Reports:

Pre-information: This event will cover art deco buildings, cultural economy, arts, music, architecture, commerce and more. This will be a community discussion about the changes in Peckham, what we all think about them, if they are good for our neighbourhood, and whose neighbourhood is it anyway? The discussion could touch on the impact of:

  • rising housing prices, regeneration, gentrification, loss of social housing.
  • heavy handed redevelopment wiping out local micro economies.
  • tall buildings in Peckham & and loss of Peckham's character.
  • possible demolition of almost half remaining art deco buildings in Rye Lane cluster.

Drop in at the exhibition in both PV and CLF studios any time from 3pm:

  • latest news on key regeneration projects, & info on Peckham's history.
  • Peckham Vision Art Deco installation.
  • Exhibition of CLF history, role, music & creativity.

More information

2015 January-March

23rd March next stages of the station co-design consultation

There will be 4 'periods' in the process.

  • 17th March Period 1 – CoDesign the Brief
  • 16th April Period 2 – Review options
  • W/C 18th May Period 3 - Emerging proposals
  • Mid June Period 4 – Planning, leading to submission of planning application.

For information on what will be covered in each period SEE HERE.
It appears that decisions on the following major issues may be taken in Period 2 around the end of April:

  • the extent of the demolition or refurbishment in front of the station and the corner of Blenheim Grove and Rye Lane,
  • location or relocation of existing tenants; location of public toilets, taxis, buses and drop-off’s; greening extent & character.

17th March Peckham Rye Station square codesign workshop

Outcome: This 'workshop' reintroduced everyone to the project and explained the timetable going towards the planning application. Then the 100 or so people in 7 groups shuffled the 30 Aspirations into their top 13. Those 7 x 13 top ones will feed in to the architects' work to be reported week commencing 13th April.Consultants' report from workshop here.
Publicity: Southwark Council email with latest news about the Station Gateway developments: “Landolt + Brown have been appointed to take forward the designs for Peckham Rye Station square. The Peckham Rye Station square project has been commissioned by Southwark Council in partnership with the Greater London Authority to transform the area around the Station. The project will create a new square as a focal point for the community, and include new and refurbished buildings to make the area more uplifting and less congested. The first co-design workshop of the design stage will be held on Tuesday 17th March 2015 at 6.30pm at All Saints Church Hall on Blenheim Grove (see map below). We want to build on the co-design work previously undertaken and hear from you about how we can work together as the project moves forward. The project design team, led by architects Landolt + Brown, would like to explain some of their initial thinking and observations in the first part of the workshop. This will be followed by a presentation from the Council on associated town centre projects. Please join us."

13th March Station codesign - Questions to ask, Issues to watch

'CoDesign' for Peckham Rye Station starts again 17th March 6.30pm-8.30pm, at All Saints Hall, Blenheim Grove. Main topics now include:

  • the design for the station square.
  • whether the Rye Lane corner buildings on Blenheim Grove and Holly Grove (Iceland), and 4 Holly Grove (Hannah Barry Gallery) will be demolished to be replaced with tall buildings.
  • preservation of the Art Deco cluster of buildings.
  • what Network Rail are planning for Dovedale Court.
  • what Southern Rail are planning for improved access to the platforms.
  • where the public toilets will be.
  • and more…

If you want to hear the latest and contribute to the discussion, come along on Tuesday 17th March 6.30pm

3rd March 2015 Update on the Station developments

  • There has been news from Brixton where Network Rail are planning a clear out of what are reported as successful long-standing businesses in railway arches for 'refurbishment', with promises of returning. It sounds familiar from a year ago at Peckham Rye station. This approach may yet return to Peckham as Dovedale Court and the Holly Grove buildings were not covered by the 'co-design' consultation that was conducted last Autumn. So it seemed worth remarking on that somewhere: see Peckham Vision letter to SLP.
  • We may know more once the next 'co-design' process starts. The new station 'co-design' architects, Landolt & Brown, were announced on 9th February But there is still no news from them or the Council on how they are going to conduct the 'co-design' of the brief for developing the planning application, or what the new timetable is.
  • Landolt & Brown were the architects hired by the Council and Network Rail in 2012, and they produced the option that became the 'preferred option' which was clearance of the whole site. The new architects Weston Williamson then used that option to develop the proposals for the planning application. They presented those proposals in January 2014 at the Rye Lane Chapel meeting, and they were strongly rejected by the many local people there.
  • After that the idea of co-design was proposed by the deputation to the Council about the way forward. The idea was to have constructive and informed public discussions about the future of the whole of the Network Rail land around the station and the feasible options for it. Sadly the co-design process that finally took place last September and October was not that at all as it was focussed on details of the appearance of the new square in front of the station.
  • This was an unexpected and disappointing outcome of what had been thought a promise to have a more collaborative process for developing ideas for the site as a whole. It leaves undiscussed the future of Dovedale Court, and the buildings in Holly Grove, and how it all fits into the town centre itself.

20th February 2015 Co-Design shrinks to small consultation

thumb displays

from Eileen Conn, Coordinator, Peckham Vision:
Dear SLP Letters,
You reported (13 February) the appointment of the architects for the design of a new square in front of Peckham Rye station, and asked for comments on the priorities. One priority is to hear what is happening about the plans for the buildings on Holly Grove, and in Dovedale Court behind the station. Both these areas were a key part of the site to be wholly demolished in the previous plans. The plans were stopped to enable a 'co-design' process where local people could engage in serious discussion about the options for all the different parts of the site.
It was perplexing to discover last autumn that the 'co-design' process had shrunk to a 'consultation' just about the design of the small area in front of the station. This defeated what we thought had been agreed last year for local people to take part in thinking about the whole site around the station on the west side of Rye Lane, and how it fits into the self regenerating dynamic of that part of town.
The silence on what is happening on the Holly Grove and Dovedale Court arches is worrying when we see the reports of Network Rail's plans to demolish and clear out the successful vibrant arches in neighbouring Brixton, and Herne Hill. It raises the same questions we wanted to explore in the 'co-design' - why does anyone think of demolishing an area to regenerate it when it is already self regenerating successfully, and in Brixton's case already self regenerated?

9th February Architects announced

Council announced the appointment of [http://www.landoltandbrown.com/ Landolt & Brown as the station square architects. 11 days later (19 February) there has been no news of the timetable or when local people will be allowed to say anything at all about either the consultation process or the design of the new square and buildings. This is the brief for the contract.

25th January architects selected

Four architects Ash Sakula Architects, Weston Williamson & Partners, Landolt & Brown, Henley Halebrown Rorrison were shortlisted and interviewed on 14th January. Two self nominated residents were part of the shortlisting and interviewing panel. The result is expected to be announced by end January. A public meeting is planned for early February in Peckham Vision Bussey exhibition studio on the process, the news and the way forward.

2014 October-December

9th December: Architects meet residents during tender period

architects meet the CoDesigners

Nine architects have been invited to tender for the contract to develop the design and planning application for the Peckham Rye Station development project. These are: Ash Sakula Architects, Weston Williamson & Partners, Landolt & Brown, Sarah Wigglesworth, Adam Khan Architects, Cottrell & Vermeulen (local consortium), Duggan Morris Architects, Peter Barber Architects, Henley Halebrown Rorrison. Submissions have to be made by 23rd December, and the architects will be selected in the early part of January. At Peckham Vision’s suggestion, the Council invited the nine firms to meet on 9th December some 40 of the CoDesigners while they are developing their submissions. This event was held in Peckham Vision’s studio in the Bussey Building, and was a successful first in bringing residents and architects together at this early stage.
website malfunction - pics to be uploaded again

19th November: WEEKLY meetings continue

The Atlas of Aspirations LINK has been submitted to the Council. This will accompany the tender document about to be sent in the next few weeks to architects who are interested in bidding for the contract for the Council’s plan to develop the building around the station. In the meantime, local residents who volunteered to help produce the WEEKLY publication on the CoDesign material continue to meet on Tuesday evenings 7-9pm, now in All Saints Hall behind the church opposite Bar Story in Blenheim Grove.Two of the Weeklies have been produced and another 6 are in preparation. As well as editing the WEEKLY publications the Tuesday evening meeting is also the place where issues that have arisen and are arising, about the station development and about the process, are discussed

10th November: Atlas of Aspirations v2 completed

5th November: deadline for comments

The CoDesign process is ending this week. An 'Atlas of Aspirations' is being prepared, by the Council's CoDesign consultants Ash Sakula, summarising 'outcomes and findings' of the CoDesign process. The draft Atlas is here: http://goo.gl/y4rLBN. The deadline for Comments is WED 5th NOVEMBER.

  • Ash Sakula will submit the Atlas to Southwark Council at the end of this week. They say: ""We need YOU...to give us feedback on the DRAFT ASPIRATIONS. Email us with your top 10 Aspirations from the list. If you feel that any Aspirations are not clear enough or that there are any Aspirations that have not been represented then please email with your comments and feedback."" Email: contact@peckhamcodesign.org
  • The Council's consultants will be giving an update to the Peckham Community Council on Monday 10th November 7pm at Peckham Academy. Agenda: http://goo.gl/QZHhAO
  • The CoDesign remit has been limited to the creation of a square in front of the station between the two rail viaducts. This has been a surprise as it left out the development issues that caused local people to protest very strongly in early 2014 against proposals put forward by Network Rail.
  • It has emerged that plans are still being developed for the rest of the site, including new taller buildings on Blenheim Grove and Holly Grove.
  • Comments on the other parts of the site and how it fits together have been recorded by the consultants. So if you have views on any of the site development and the area surrounding it,send them in as points to take into account in the Atlas. Email: contact@peckhamcodesign.org

As time is now very short, here is a summary list of topics that have stimulated comments, and which you can use to check if you have anything further you wish to say or need to be reflected in the Atlas:

  • Design of the new square, & services & facilities, including public toilets.
  • The station building & access to the station platforms.
  • Future of Holly Grove & Blenheim Grove commercial buildings.
  • Preserving & restoring the cluster of Art Deco buildings in that area.
  • Future of Dovedale Court and improving forecourts in Blenheim Grove.
  • Opening up Eastern arches, & green pathways along the rail lines towards Queen's Rd station.
  • Public realm in central Rye Lane around the station site.
  • Need for integrated town planning.

Links for more information on some of these in thinking about your comments:

October 2014 Blenheim Grove corner feasibility study

In October 2014, the Council commissioned Weston Wiliamson & Partners to carry out a feasibility study for replacing the existing art deco building at 82 Rye Lane & 2-10 Blenheim Grove. The report on this is HERE. It concludes that four storeys is the optimum height for a new building. The question which was subsequently asked in the co-design process at this stage was whether the benefits of such a new building justified its cost, disruption and loss of the art deco quarter.

September - October Some CoDesign comments

Here are some extracts from comments posted up on the CoDesign website:

  • I think we need a coherent plan for the whole area owned by Network Rail rather than a bitty approach. Personally I think all that needs to happen is a bit of painting and tidying up. We don’t need any new tall buildings and I think we need to preserve the Art Deco buildings around the station. I think Dovedale Court and its businesses should be protected. Maybe just open out the front of the station a bit but please keep businesses that have been in Peckham for years! There is no need at all to turn Peckham into Clapham- peckham is beautiful as it is, it just needs a lick of paint. Olivia Brambill
  • Why are the development issues that caused local people to protest very strongly in early 2014, against proposals put forward by Network Rail, not part of the scope of the Co-Design process? Planning issues in the central Peckham area need to be looked at in an integrated way. Extract from Sally Mcintosh & Kevin OBrien
  • The new opened space in front of the station will be a core part of the town centre. So its design needs to take into account fully how it will function socially, physically, commercially and economically in relation to the area close by – notably Elm Grove, Holly Grove, Blenheim Grove, Rye Lane between Elm Grove, Cinema/Moncrieff Place, Bournemouth Road and the future potential developments in the eastern arches. We need to develop an overall holistic town centre plan for this central Rye Lane area for the day, evening and night time economies. Extract from Eileen Conn

September - October 2014 CoDesign Process for comments

Comments have been contributed in a variety of ways:

Thursday 16th October Community exhibition & Peckham Society symposium

THURSDAY 16th OCTOBER 4pm Exhibition. 7-9pm Forum with slide show: the Peckham Society's annual symposium, jointly presented with Peckham Vision

Tues 7th October Community Discussion: Re-imagining Peckham Rye station area

This event on 7th October 6-9pm was the first in our new temporary exhibition studio space, and was busy from the moment the doors opened. It displayed the community model of central Rye Lane, and also the Nicholas Cobb model of the multi storey car park in 100 years after some cataclysmic event. The Peckham Vision mobile exhibition displays were available as were specially produced wall displays of photos, maps and diagrams, about the station area, collected from a variety of sources including local people's imaginative sketches. They all supported lively discussions between local residents re-imagining the buildings and the spaces around the station.

Earlier dates 2007 - 2014

Click here for earlier dates:

April 2007 – January 2013 http://www.peckhamvision.org/wiki/Peckham_Rye_Station_stages

April 2013 to November 2013 http://www.peckhamvision.org/wiki/Peckham_Rye_Station_Gateway/2011-2013

January – September 2014 http://www.peckhamvision.org/wiki/Peckham_Rye_Station_Gateway/Jan-Sep_2014